Free to play, no login. Want the full activity with student pages and answer key?Get it on TpT More free simulations
AP ENVIRONMENTAL SCIENCE · UNIT 8 · TOPIC 8.1 SOURCES OF POLLUTION

The Creek Doesn’t Lie

Use dry-day and storm-day water data to find ten hidden pollution sources on Marrow Creek.

The call

Marrow Creek runs from a forested ridge to Still Lake. Lake managers say it arrives dirty, warm, and full of bacteria. Six monitoring stations measured it on a dry day and a storm day. Ten sources hide along five reaches. You are the investigation team.

StillLakeREACH 1S1 → S2REACH 2S2 → S3REACH 3S3 → S4REACH 4S4 → S5REACH 5S5 → S6S1S2S3S4S5S6Marrow Creek flows left to right, from the headwaters (S1) to Still Lake. Fictional watershed.

Three detective rules

1. Steady jump: the same increase on both days = a pipe or tunnel, one identifiable place (point source).

2. Storm jump: much bigger on the storm day = rain washing pollution in from a wide area (nonpoint source).

3. Read the pollutant: heat = hot water; low pH = acid; turbidity = soil; nitrate = fertilizer or waste; bacteria = animal or human waste.

Key words

Point source: enters from one single, identifiable location.

Nonpoint source: enters from many scattered places or a wide area.

Natural vs. human: natural events vs. human activities. Natural does not mean harmless.

Illustrative data: values are hypothetical. Marrow Creek is a fictional watershed.

Part A: Sort the sources

Natural or human? Point or nonpoint?

Part B: Read the creek

Illustrative data: values are hypothetical.
Jump = downstream reading − upstream reading. Fill in the jumps for Reach 1 and Reach 3 (20 boxes). Use the data tables above.

Part C: Solve the case

Use the Reach Report. For each source, choose its reach, the measurement that jumped, the pattern, and its classification. Sources you place appear on the map.

Illustrative data: values are hypothetical. Jumps are already calculated.
StillLakeREACH 1S1 → S2REACH 2S2 → S3REACH 3S3 → S4REACH 4S4 → S5REACH 5S5 → S6S1S2S3S4S5S6Marrow Creek flows left to right, from the headwaters (S1) to Still Lake. Fictional watershed.

Part D: Shares and a plan

Nitrate at S6 is 4.5 (dry) and 8.1 (storm) mg/L. At S1 it is 0.3 on both days. The Sewage Plant Pipe adds 3.0 mg/L on both days.

StepDry dayStorm day
1. Nitrate added (S6 − S1), mg/L
2. Sewage pipe’s share (%), nearest whole

Choose a project

Project 1: plant upgrade removes 2.0 mg/L from the pipe on every day. Project 2: buffer strips and a fertilizer plan cut Corn Fields’ input (0.7 dry, 3.0 storm) by 80%.

Nitrate removed at S6 (mg/L)Dry dayStorm day
Project 1
Project 2
Illustrative data: values are hypothetical.

Liked The Creek Doesn't Lie?

The full activity (Topic 8.1) comes with student pages, an answer key and editable files, ready to use with your class.

Get the full activity on TpTMore Unit 8 simulations

AP® is a trademark registered by the College Board, which is not affiliated with and does not endorse this product.