Case File: Dead Creek
A creek that was full of mayfly and stonefly larvae now runs orange and cloudy below a mine. You are the mine inspector. Find out why, then decide how to spend a $7 million reclamation bond.
5 JOBSYour mission
Illustrative data: values are hypothetical. The mine, creek and costs in this file are invented.
KEY TERMSClick each card to flip it
PREDICTBefore you look at any data
Name two ways a mine could change the water in a creek that flows past it.
Your answer stays on this page only.
Part A · Know the Methods
A1Name and label each diagram
Choose the method name for each diagram, then label each part using the drop-downs.
A2Match the impact
A3Photo ID
A4Ore math
Copper ore holds about 0.5% copper. A pit must also remove 2 tonnes of waste rock for every 1 tonne of ore (2:1 stripping ratio). Illustrative data: values are hypothetical.
1) Ore needed for 1 tonne of copper: t 2) Waste rock removed: t 3) Total rock moved: t
Part B · Creek Forensics
B1Sample the creek
Click a station on the map, then press Test water. Sample all six. Illustrative data: values are hypothetical.
No station selected.
NTU = cloudiness (higher is cloudier). Taxa = kinds of mayfly, stonefly and caddisfly larvae.
Part C · Lab Bench (virtual)
Acid mine drainage in a cup
Red cabbage juice changes color with pH. Cup = the creek. Vinegar = acid from the tailings pond. Antacid = limestone.
Vinegar (acid seep): 0 mL
Extra water (dilution): 0 mL
Crushed antacid (limestone): 0 tablets
TASKSDo them in order
- Add 5 mL of vinegar to the creek. What happens to the color?
- Now add 100 mL of water. Is the water still acidic?
- Add antacid until the pH is between 6.5 and 8.5.
Describe what dilution did, and explain why limestone is used:
The model uses real acid-base chemistry for vinegar (acetic acid) and calcium carbonate. Fizzing is carbon dioxide.
Part D · Reclamation Plan
Spend up to $7.0 million up front. Meet every target at all six stations: pH ≥ 6.0 · cloudiness ≤ 25 NTU · iron ≤ 1.0 mg/L. Then find the plan with the lowest 30-year cost.
D1Options
BONDUp-front budget
TARGETSDoes it work?
D2Creek predictor
Gray = today. Colored = after your plan. The dashed line is the target.
D3Your saved plans
D4Trade-offs
Compare your cheapest-up-front plan and your cheapest-over-30-years plan. Which is which, and why?
Part E · Inspector's Report
CLAIM
Name the two main ways the mine is harming Dead Creek and the plan you recommend.
EVIDENCE
Give at least three data points (station, pH, NTU, iron, taxa or lab color).
REASONING
Explain how each source causes the damage and why your plan works. Use: overburden, tailings, acid mine drainage, reclamation.
COST
Compare the up-front and 30-year cost of your plan with one other plan.
EXITExit question
Explain why capping the tailings pond can cost taxpayers less over 30 years than a limestone channel, even though it costs more to build.